The unit is the fact, not the system. How to decide which record wins for each fact, the three honest relationships a copy can have, and how to find your conflicts.

Carlos Antonio Benito 5 min read

Ask three people in a small hardware company what the manufacturer part number for C12 is, and you can get three answers. The schematic symbol has one. The BOM spreadsheet has another, because it was corrected after a sourcing problem. The purchasing system has a third, because somebody ordered a near-equivalent once and it stuck.

All three are real records. All three are wrong, in the sense that none of them is the answer, because the project never decided which one would be.

"Single source of truth" is the usual label for the fix, and it is routinely misunderstood as a demand to put everything in one system. It is not. Most hardware projects legitimately have five or six systems, and will keep them.

The unit is the fact, not the system

The useful version of the idea is much smaller:

For each fact, exactly one place is authoritative. Every other appearance of that fact is a copy, and is marked as one.

The manufacturer part number for C12 is one fact. The quantity of C12 on the board is another. The price is a third. They do not have to live in the same place, and usually should not, because different facts change on different clocks and are owned by different people.

The question to answer is not "which system should we use?" but "for this fact, which record wins when two disagree?"

Working out who owns what

This is a half-hour exercise with a whiteboard. List the facts your project cares about and name an owner for each.

FactPlausible ownerWhy
Which parts are on the boardSchematicIt is where the design is made
Reference designatorsSchematicSame
Physical placementLayoutSame
Manufacturer part numberComponent recordOne part, used by several boards
Package and footprintComponent recordA property of the part
Approved alternativesComponent recordApplies wherever the part is used
Quantity per boardBOMDerived from the design
Supplier, price, lead timePurchasingChanges weekly, owned elsewhere
Stock on handInventoryChanges hourly
What was actually builtBuild recordA historical fact, never edited
Why a part was chosenDesign notesRationale, not data

Yours will differ, and the assignments above are arguable. That is fine — the value is in the argument, because the places where two people assign the same fact to different owners are exactly where your current conflicts come from.

Three honest relationships

Once owners exist, every other copy of a fact must be in one of three relationships with its source. Anything else is drift waiting to happen.

Source. The authoritative record. Edited directly.

Derived. Generated from the source by a repeatable process, and regenerated when the source changes. A BOM exported from the schematic is derived. A derived copy is never edited; editing it is how the two diverge.

Reference. A pointer rather than a copy. "See component record C-1042." It cannot go stale, because it does not duplicate anything.

The failure mode is the fourth relationship, the unnamed one: a copy that was derived once, then edited, and is now an independent record that looks authoritative and is not. The spreadsheet that was exported in March and corrected in April is the canonical example.

Copies are fine if they are honest

This is worth stating plainly, because "single source of truth" is sometimes used to argue against ever duplicating anything, which is impractical.

You will send a BOM to a supplier. You will paste a part number into an email. You will print a drawing. Those are copies and they are necessary.

What makes a copy safe is that it says what it is:

  • a date, or better a revision, on its face;
  • a statement of where it came from;
  • ideally, a note that the source governs if they disagree.

A BOM export headed "ORION MCB, BOM Rev 4, exported 2025-03-14 — current version in the component system governs" is a safe copy. The same file named BOM_final_v3_NEW.xlsx is a hazard, because nothing on it tells a reader whether to trust it.

Finding your own conflicts

A quick diagnostic, worth doing once:

  1. Pick a single component used on two different boards.
  2. Write down everywhere its part number appears — schematics, BOMs, purchase

records, test documents, supplier portals.

  1. Compare them.

Most teams doing this for the first time find at least one disagreement, and the useful part is not the disagreement itself but the question it forces: who should have won? Answer it, write the answer down, and you have your first ownership rule.

Repeat for the facts that have caused an actual problem in the last year. Three or four rules cover most of the damage; a complete map of every fact in the project is a project in itself and rarely gets finished.

When the rule is hardest

Two situations break ownership rules reliably, and both are worth planning for.

Urgency. A part is unobtainable, production stops, somebody substitutes on the floor and tells the system later — or never. The fix is not to forbid it; it is to have a fast, low-ceremony way to record it afterwards.

Tools that cannot reference. A spreadsheet cannot hold a live pointer to a component record. The practical mitigation is to put the identifier in the copy, so a reader can at least look up the source by hand.

Neither is solved by discipline alone, and a rule that only holds on calm days is not a rule. The realistic aim is that disagreements become visible quickly, not that they never happen.


Deciding who owns each fact is the part you have to do yourself. Where it helps to have a tool is in the second half: making a fact storable once and referenced from everywhere it is used, instead of copied.

XKEMA holds components as shared records referenced by the boards that use them, so a part's data lives in one place rather than repeated in each project's BOM.

Where to go next

Tools & workflow

When Does a Hardware Project Outgrow a Spreadsheet?

Five stages, and the specific thing that breaks at each one. The four structural limits behind all of them, the cheap fixes first, and what to move if you move.

¿Te ha resultado útil?

Reddit LinkedIn

The XKEMA newsletter

Hardware engineering worth keeping

New courses, engineering notes and hardware guides, whenever there is something genuinely worth reading. Nothing else.

We will email you to confirm. You can unsubscribe from any issue.

XKEMA, in one sentence

Engineering knowledge management software for companies that develop electronic products: the product structure, its bills of materials, its documentation and its revisions, all in one place.